For the construction of our case, we were helped by Professor Whit of the Construction Management department. He provided us with precut pieces, with pilot holes already drilled. We assembled the case by building most of the frame, sliding in the plexiglass, and completing the side with the final side of the frame. We added hinges to the top so we could open it and change the scenery inside.