Background:

 

Drawbridges

*    ON average opening and closing time = 1 minute

*    Are Operated by a Drawbridge attendant

*    Built to provide clearance for boat traffic, where stationary bridges would have too step of grades

*    Uses counterweights to help open and close

 

 

The Problem:

 

Design and build a control system that can be implemented into an existing (Bascule) bridge system that will apply the following…

*    The bridge will automatically sense presence of automobiles and boats while assuring safety.

*    This bridge will not account for pedestrian traffic.

 

 

Our Solution:

Build a realistic 3D model of a Bascule Bridge and river that will have…

*    Sensors (placed appropriately) and microcontroller will work together to detect and control traffic of miniature boats and automobiles

*    A central controller to receive data from the traffic sensors and boat sensors to open the bridge at the correct time to ensure safety 

*    Software will acknowledge boats by sound

*    Software for general control, including functionality to prioritize traffic of automobiles versus boats based on peak traffic hours

 

System Overview:

 



Schedule

 

Research/Feasibility Testing

 

 

Design Concepts and drawing

 


Mechanical


Bridge Design
(Opens new window)


Canal Design 1
 (Opens new window)


Canal Design 2
(Opens new window)


Canal Design 3

(Opens new window)


Electrical

 

 

 

 


Software

 

 

 

 

 

 

 

 

 

 

 

    

 

 

Autodesk Inventor Files

*       All Drawings Depicted below are drawn by Ryan Bidlack unless otherwise noted

 

Bridge Controller

 

Part Name

3D Model

Animation

Drawings

Single leaf

Bridge

Assembly

(Opens new window)

N/A

Working Drawing

(Opens new window)

 

Whole Bridge

 

(Opens new window)

Video

(Opens new window)

N/A

 

Canal Frame

 

(Opens new window)

N/A

Working Drawing

 

Canal Frame With Bridge

 

(Opens new window)

N/A

N/A

 

Presentations

Design Presentation 1 December 12, 2006

Status Report 1  January 17, 2006

Design Presentation 2 February 7, 2006

 

Related Links/ Resources

 

 

 

Waterproof microphones (Opens new window)

Technical Support: (800) 332 -2040

 

 

Waterproof Speakers (Opens new window)

Technical Support: sales@euroshine.com.cn                                                                   

 

 

Introduction to the Design

of Steel and Composite Bridges

 

 

 

website

 

 

 

 

 

 

 

 

Electromechanical Engineering Technology Program 
Vermont Technical College, Randolph Center, Vermont

 

VTC Home Page

 

BSEMT Program

 


This website was created by Vermont Technical College Students
Sarah Steward And Chad Harrington.
For Questions or concerns,
please contact us @
or Sarahsteward@hotmail.com or cbh10030@vtc.edu